2014-09-17- 8009.700 - Rel Notes - Final - SAP POS Extract - Enhance logic For A552 table performance #SAPReleases2014

Release Notes - Draft / Final


8009.700 - SAP POS Extract - Logic change to improve A552 table performance.


Admin Info




Purpose
Change the logic to improve A552 table performance to get the materials list of ZMRP value changes.
Release No
005
Submitted on
09/17/2014
Submitted by
Deepak yasam
Environment
NECNED to NECNEQ
Sent To
Craig Spangler
Object(s) created by
venkat kondapally
Object(s) tested by
Deepak Yasam
Transport Status
Created in NECNED100

Transport and Technical Objects


Sl.
Transport ID
Description
Object Name
1
NEDK927345
SD:8009: POS EXtract to Improve A552 Table Performance
ZIMM_XML_INVENTORY_OUTPUT

Release Notes


For Infrastructure

None

For Requestor

Below is the previous transport.

NEDK926840 SD:8009:Change the logic of color and tax fields inventory



Test Notes


System : NECNED300

Test ID
Test Scenario
Expected Results
Actual Results
P/F
Documents
Notes
Tested By
QA By
SD-001
Create a variant with date as input and the reatil orders check box flagged with currency as GBP in the selection inputs.Change the material description,product attribute 5,ZMRP price,customer material numberfor the list of materials
Execute the program through batch job.
1.The materials with the changes in material description,product attribute 5,ZMRP price,customer material number should be picked in the program and dispalyed in the output.
1.The materials with the desired changes are dispalyed in the output.For all the materials the tax code should be dispalyed as 0 except 1000219 that shows the tax code as 1 in the output file. 2.The description 3 dispalyed with color and the descrption 2 is blank for all the materials in the file.
P
10000218
10000219
10016819
10016945
10016946
10017002
10017055
10017068
10017075
10017076
10017077
10017468
10017534
10017535
10017591
10017592
10017596
10017598
N/A
Deepak yasam
Deepak Yasam
SD-002
Create a variant with date as input and the reatil orders check box flagged with currency as EUR in the selection inputs.Change the material description,product attribute 5,ZMRP price,customer material number for the list of materials
Execute the program through bacth job.
The materials with the changes in material description,product attribute 5,ZMRP price,customer material number should be picked in the program and dispalyed in the output.
The materials with the desired changes are dispalyed in the output.
P
10000218
10000219
10016819
10016945
10016946
10017002
10017055
10017068
10017075
10017076
10017077
10017409
10017410
10017411
10017468
10017534
10017535
10017591
10017592
10017596
10017598
N/A
Deepak yasam
Deepak Yasam

System: NECNEQ100


None



Reference Document (Specification or Production Support Break Fix)

Deepak - 2014-05-29 - 8009.200 - Spec - POS Integration